Stewart Middle School

Historic renovation of a 1920s middle school, featuring seismic upgrades, modern electrical systems, and a design-build smoke evacuation system.

Project image 1
1 / 16
Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Thumbnail 5
Thumbnail 6
Thumbnail 7
Thumbnail 8
Thumbnail 9
Thumbnail 10
Thumbnail 11
Thumbnail 12
Thumbnail 13
Thumbnail 14
Thumbnail 15
Thumbnail 16

Project Overview

The Stewart Middle School project transformed a 1920s-era landmark building into a modern educational facility while preserving its historic character. This 134,000 square foot project included a combination of 103,090 sqft of renovation and 23,792 sqft of new construction, making it one of Tacoma’s most significant school modernizations.

The renovation focused on creating a 21st-century learning environment while addressing structural and safety upgrades. The school was reorganized into small learning communities of approximately 120 students, easing the transition from elementary to high school. Transparency and open sightlines throughout the building enhance both natural daylighting and passive supervision, creating a safe yet independent space for students.

Scope of Work

Our team played a crucial role in the electrical renovation, providing expertise in the following areas:

  • Seismic-compliant electrical installations, ensuring all systems met modern seismic codes despite limited overhead space on levels 1 & 2.
  • Design-build smoke evacuation system for two large atriums, requiring precise coordination.
  • Modern lighting and power solutions, supporting classrooms, Da Vinci STEM labs, and multi-purpose learning spaces.
  • Special systems integration, including AV infrastructure for a video recording studio and robust school-wide multimedia capabilities.

Our VDC (Virtual Design and Construction) team played a crucial role in preconstruction planning, allowing for efficient system routing within tight spatial constraints. This reduced onsite challenges and ensured a seamless installation process.

Challenges & Solutions

  • Seismic Upgrades & Space Constraints
    The need to bring the structure up to modern seismic standards significantly limited available space for electrical pathways on the lower levels. Through early VDC modeling and pre-planning, we successfully optimized routing to avoid conflicts with other building systems.

  • Balancing Historic Preservation with Modernization
    The project required maintaining the school’s historic character while integrating state-of-the-art electrical and special systems. Our approach ensured that heritage elements were preserved, while students and staff benefited from the latest in lighting, safety, and AV technology.

Results

The completed renovation provided:

  • A fully modernized electrical infrastructure within a preserved historic building.
  • Seismic-compliant electrical systems, ensuring safety and resilience.
  • Highly flexible learning environments, including STEM labs, video production studios, and multipurpose spaces.
  • Improved student safety through thoughtful lighting, security, and passive supervision strategies.
  • A nationally recognized, award-winning learning facility, earning the 2018 Learning by Design Citation of Excellence.

Through careful planning, innovative problem-solving, and precise execution, we helped bring new life to a historic school, ensuring it meets the needs of students for generations to come.

Last updated: March 1, 2025

Project Details

Client

Tacoma Public Schools

Completion Date

December 30, 2017

Location

Tacoma, WA

Interested in a similar project?

Get a Quote
Premier Power Electric
(360) 491-9261

Office Hours

Monday - Friday: 7:00 AM - 4:30 PM

Saturday: Closed

Sunday: Closed

You can also reach us by:

[email protected]

Fax: (360) 438-6920